Quincy Avenue Paving Project
 Click here for the interactive Project Map
DESCRIPTION:

Improvement of Quincy Avenue from the east curb line of South Broadway Street to the east curb line of Stilwell Street south of Quincy Avenue, a distance of approximately 3,310 feet (designated as Paving District No. 10-1), by first removing the existing pavement, drainage improvements, curb and gutter, and incidental construction relating to the improvement, easement and right-of-way acquisitions, three lanes of paving, a transition from three lanes to two lanes, pavement marking, constructing and/or updating of wheelchair ramps at all corners in compliance with ADA, surveying, intersections at Elm Street south of Quincy Avenue, Elm Street north of Quincy Avenue, Joplin Street, Smelter Street north of Quincy Avenue, Homer Street north of Quincy Avenue, Homer Street south of Quincy Avenue, Stilwell Street north of Quincy Avenue, and Stilwell Street south of Quincy Avenue, sidewalks, drive approaches, traffic signal at the Joplin Street intersection, design and construction engineering.

AUTHORIZING RESOLUTION:

1099:  Approved 02/23/10
(Authorize Project, Temporary Notes and G.O. Bonds Not to Exceed $6,000,000)

[Need to pass new Resolution reducing the project from the east end of Homer Street to the east end of Joplin Street per City Commission.]

ESTIMATE OF PROBABLE COST:

$3,200,000 (Reduced from $5,800,000)
Water Line Cost - $420,000 (Total Budget for 16” and 8” water lines on this street.)

FUNDING SOURCE:

KDOT Grant 80% State/20% Local funding split
KDOT Share             - $1,872,600
City Share                 - $1,327,400

ENGINEER:

DESIGN
Professional Engineering Consultants
902 S. Broadway
Pittsburg, Kansas 66762
Contact Person:      

Bruce D. Remsberg, P.E.
(620) 235-0195 - Office
(620) 249-6438 - Mobile

Contract Dated:        02/08/2011
Contract Amount:     Not to exceed $224,533 (Total Phase I and II)

BID LETTING:

January 2014


STATUS UPDATES: