East 4th Street Sewer Line Repair
 Click here for the interactive Project Map
DESCRIPTION:

When East 4th Street was rebuilt several years ago, a new bridge was constructed over the East Fork of Taylor Branch.  During the construction, the southeast interceptor serving the entire northeast quadrant of the City was broken and when concrete was placed for the abatement it entered the sanitary sewer and partially blocked it.  TV inspection of the sanitary sewer cannot be completed in its entirety due to the blockage, but the City is confident that the sanitary sewer allows surface water to directly enter the wastewater collection system.  It is necessary to move the sanitary sewer slightly north and construct two new manholes and an additional creek crossing to remedy this problem.

AUTHORIZING RESOLUTION:

NOT NECESSARY SINCE PROJECT IS BEING FUNDED THROUGH THE STATE REVOLVING LOAN FUND.

ESTIMATE OF PROBABLE COST:

$100,000

FUNDING SOURCE:

$4,000,000 State Revolving Loan
Funded by the Kansas Water Pollution Control Revolving Funds Assistance Program administered through the Kansas Department of Health and Environment.

ENGINEER:

Professional Engineering Consultants
902 S. Broadway
Pittsburg, Kansas 66762

Contact Person:                  
Bruce D. Remsberg, P.E.
(620) 235-0195 - Office
(620) 249-6438 - Mobile

Contract Amount:       $17,570 (Not-to-Exceed)

BID LETTING:

TBD


STATUS UPDATES: